Mean-value bound for a nonzero shift
Abstract
Mean-value bound for a nonzero shift
Theorem 1.1 (Mean-value bound for a nonzero shift).
Lean statement: D5/S3/Arith/Additive/Waring/WaringIndStep2Estimates.integral_norm_T_pow_le_R
Proof. Machine-checked in Lean as D5/S3/Arith/Additive/Waring/WaringIndStep2Estimates.integral_norm_T_pow_le_R (✓ std3). ∎
Citation. The Waring formalization authors (2026). Waring’s theorem in Lean 4. URL: https://github.com/yunyougu50-create/waring-lean4/tree/cd0735c253f3b640262fcc74a61306cb41e23765.
Commentary.
For polynomials of degree d ≥ 3 and bounded coefficients, a mean-value estimate at degree d−1 bounds the unit-interval norm integral of every nonzero shift in the prescribed box.
Theorem 1.2 (Fourth moment of the displacement sums).
Lean statement: D5/S3/Arith/Additive/Waring/WaringIndStep2Estimates.integral_sum_pow_four
Proof. Machine-checked in Lean as D5/S3/Arith/Additive/Waring/WaringIndStep2Estimates.integral_sum_pow_four (✓ std3). ∎
Citation. The Waring formalization authors (2026). Waring’s theorem in Lean 4. URL: https://github.com/yunyougu50-create/waring-lean4/tree/cd0735c253f3b640262fcc74a61306cb41e23765.
Commentary.
For every natural number s, including zero, the fourth power of the sum of displacement norms raised to 2s expands pointwise over four phase fibers. Integration over the unit interval retains exactly the terms whose integer phases sum to zero, weighted by the product of the four fiber cardinalities.
References
- Truth anchor:
D5/S3/Arith/Additive/Waring/WaringIndStep2Estimates.integral_norm_T_pow_le_R - Truth anchor:
D5/S3/Arith/Additive/Waring/WaringIndStep2Estimates.integral_sum_pow_four - Dependency: D5/S3/Arith/Additive/Waring/WaringCoeffBound
- Dependency: D5/S3/Arith/Additive/Waring/WaringHolder
- Dependency: D5/S3/Arith/Additive/Waring/WaringIndStep
- Dependency: D5/S3/Arith/Additive/Waring/WaringLemma7
- Dependency: D5/S3/Arith/Additive/Waring/WaringLemma8Form
- Dependency: D5/S3/Arith/Additive/Waring/WaringQuadratic