Keyboard shortcuts

Press ← or → to navigate between chapters

Press ? to show this help

Press Esc to hide this help

Conditional actual five-mode small slack

Abstract

Conditional actual five-mode small slack.

Theorem 1.1 (Uniform original-record predecessor).

Lean statement: D5/S3/Arith/Robin/PriceRecord/ActualFiveModeSmallSlack.bhp_actual_five_mode_small_slack

Proof. Machine-checked in Lean as D5/S3/Arith/Robin/PriceRecord/ActualFiveModeSmallSlack.bhp_actual_five_mode_small_slack (✓ std3). ∎

Source. Repository-derived.

Commentary.

The hypotheses BHPMaximumGap and BHPShortIntervalCount remain independent explicit analytic suppliers at exponent 21/40. The result chooses one C,T>0 before every m>=2 and original mu>0 satisfying FullRecord(m,mu), which compares m strictly with every positive smaller integer. The threshold is imposed on P=largestPrime(m). Set lambda=beta(1,P) and Dtop=lambda*log(2)-goldenLayerMarginal(2,valuation_2(m))log(2). There is an actual positive n<m whose eta=log(m)-log(n) is positive and at most Clog(log(m))^(-4).

The same predecessor satisfies both abs(goldenResourceObjective(lambda,n)-goldenResourceObjective(lambda,m)-Dtop)<=Clambdalog(log(m))^2P^(-19/640) and Dtop<=(lambda-mu)eta+Clambdalog(log(m))^2*P^(-19/640). These inequalities retain the actual highest occupied 2-layer separately from every auxiliary insertion and deletion fee. They use the original record inequality at mu for this very same n.

The five signed modes are exactly 1,2,4,8,16. Both signs are realized by distinct actual primes with their original valuations; every mode supplies exactly its required cardinality, and all blocks avoid 2. The first-mode count uses index 16, whereas its price is the original occupied first-prime price. The higher-mode intervals retain the actual clamped cutoffs. The geometric price transfer, exact capacity choices, summed mass error and complete signed-fee sum all precede the actual finite predecessor identity.

The root stencil gives the fourth-order mesh. The exact selected counts multiply each pointwise error, and the resulting error with exponent 19/640 is eventually absorbed into that mesh. The uniform original-record clock transfers the bound to log(log(m)). Existing logarithmic layer rigidity, cutoff curvature and arithmetic-clock estimates are reused. This is a repository derivation of a conditional consequence; no claim of literature novelty or unconditional BHP estimate is made.

The constructed eta is test-predecessor slack, not the prescribed original b, delta or h. Full payment for modes 2,3,4,5,6,8,9,12 in both directions, the complete removed-2 tail and the missing 1/200 saving remain open. An occupied price bound on m gives no estimate at a later critical-chain price. Robin beyond 5040 and the Riemann hypothesis remain open.

References